Minera Los Pelambres          
  2003 2004

2005

2006 2007
 Payable copper in concentrate ('000 tonnes) 326.7 350.6

322.8

324.2 289.9
 Payable moly in concentrate ('000 tonnes) 8.7 7.9

8.7

9.8 10.2
 Average ore grade (%) 0.91 0.88

0,80

0.81 0.71
 Plant throughput ('000 tonnes per day of ore) 113.3 125.9 128.1 127.4 126.3
 Cash costs (cents per pound) 29.3 7.9

(17.1)

16.4 (10.8)
           
Minera El Tesoro          
  2003 2004

2005

2006 2007
 Copper cathodes ('000 tonnes) 92.4 97.8

98.1

94.0 93.0
 Average ore grade (%) 1.46 1.35

1.23

1.16 1.23
 Plant throughput ('000 tonnes per day of ore) 22.1 25.4 27.2 28.7 26.8
 Cash costs (cents per pound) 42.4 52.4

66.1

78.6 109.8
           
Minera Michilla          
  2003 2004

2005

2006 2007
 Copper cathodes ('000 tonnes) 52.7 50.0

46.4

47.3 45.1
 Average ore grade (%) 1.25 1.11

1.10

1.05 1.03
 Plant throughput ('000 tonnes per day of ore) 15.6 16.1 14.9 15.2 14.8
 Cash costs (cents per pound) 69.8 85.6

118.8

126.4 143.5
           
Transport          
  2003 2004

2005

2006 2007
 Rail tonnage transported ('000 tons) 4,388 4,479

4,336

4,486 5,008

 Road tonnage transported ('000 tons)

1,176

1,414

1,522

1,456 1,313
           
Water          
  2003 2004

2005

2006 2007
 Water volume sold - potable and untreated  ('000 m3) - 32,191

33,074

37,798 39,858