Minera Los Pelambres          
  2010 2009 2008 2007 2006
Payable copper in concentrate ('000 tonnes) 384.6 311.6 339.2 289.9 324.2
Payable moly in concentrate ('000 tonnes) 8.8 7.8 7.8 10.2 9.8
Average ore grade (%) 0.76 0.74 0.76 0.71 0.81
Plant throughput ('000 tonnes per day of ore) 159.4 129.2 136.8 126.3 127.4
Cash costs (cents per pound) 79.3 80.4 57.3 -10.8 16.4
           
Minera El Tesoro          
  2010 2009 2008 2007 2006
Copper cathodes ('000 tonnes) 95.3 90.2 90.8 93 94
Average ore grade (%) 1.10 1.25 1.16 1.23 1.16
Plant throughput ('000 tonnes per day of ore) 26.4 26.2 28.5 26.8 28.7
Cash costs (cents per pound) 169.2 123.4 144.7 109.8 78.6
           
Minera Michilla          
  2010 2009 2008 2007 2006
Copper cathodes ('000 tonnes) 41.2 40.6 47.7 45.1 47.3
Average ore grade (%) 1.03 0.96 1.06 1.03 1.05
Plant throughput ('000 tonnes per day of ore) 14.1 15.1 15.5 14.8 15.2
Cash costs (cents per pound) 183.8 157.6 191.1 143.5 126.4
           
Transport          
  2010 2009 2008 2007 2006
Rail tonnage transported ('000 tons) 6,184 6,335 5,644 5,008 4,486
Road tonnage transported ('000 tons) 1,919 1,505 1,353 1,313 1,456
           
Water          
  2010 2009 2008 2007 2006
Water volume sold - potable and untreated ('000 m3) 46,302 43,736 42,674 39,858 37,798