| Minera Los Pelambres |
|
|
|
|
|
| |
2005 |
2006 |
2007 |
2008 |
2009 |
| Payable copper in concentrate ('000 tonnes) |
322.8 |
324.2 |
289.9 |
339.2 |
311.6 |
| Payable moly in concentrate ('000 tonnes) |
8.7 |
9.8 |
10.2 |
7.8 |
7.8 |
| Average ore grade (%) |
0.80 |
0.81 |
0.71 |
0.76 |
0.74 |
| Plant throughput ('000 tonnes per day of ore) |
128.1 |
127.4 |
126.3 |
136.8 |
129.2 |
| Cash costs (cents per pound) |
-17.1 |
16.4 |
-10.8 |
57.3 |
80.4 |
| |
|
|
|
|
|
| Minera El Tesoro |
|
|
|
|
|
| |
2005 |
2006 |
2007 |
2008 |
2009 |
| Copper cathodes ('000 tonnes) |
98.1 |
94 |
93 |
90.8 |
90.2 |
| Average ore grade (%) |
1.23 |
1.16 |
1.23 |
1.16 |
1.25 |
| Plant throughput ('000 tonnes per day of ore) |
27.2 |
28.7 |
26.8 |
28.5 |
26.2 |
| Cash costs (cents per pound) |
66.1 |
78.6 |
109.8 |
144.7 |
123.4 |
| |
|
|
|
|
|
| |
|
|
|
|
|
| Minera Michilla |
|
|
|
|
|
| |
2005 |
2006 |
2007 |
2008 |
2009 |
| Copper cathodes ('000 tonnes) |
46.4 |
47.3 |
45.1 |
47.7 |
40.6 |
| Average ore grade (%) |
1.1 |
1.05 |
1.03 |
1.06 |
0.96 |
| Plant throughput ('000 tonnes per day of ore) |
14.9 |
15.2 |
14.8 |
15.5 |
15.1 |
| Cash costs (cents per pound) |
118.8 |
126.4 |
143.5 |
191.1 |
157.6 |
| |
|
|
|
|
|
| |
|
|
|
|
|
| Transport |
|
|
|
|
|
| |
2005 |
2006 |
2007 |
2008 |
2009 |
| Rail tonnage transported ('000 tons) |
4,336 |
4,486 |
5,008 |
5,644 |
6,335 |
| Road tonnage transported ('000 tons) |
1,522 |
1,456 |
1,313 |
1,353 |
1,505 |
| |
|
|
|
|
|
| Water |
|
|
|
|
|
| |
2005 |
2006 |
2007 |
2008 |
2009 |
| Water volume sold - potable and untreated ('000 m3) |
33,074 |
37,798 |
39,858 |
42,674 |
43,736 |
|
|
 |
|